WYNDHAM RENOVATION TASHKENT
-
- CONTINENT
- COUNTRY
- LOCATION
- YEAR
- MAIN AREA
- CONTRACTOR
- CLIENT
- ARCHITECTURE
- CATEGORY
- DESCRIPTION
-
- ASIA
- UZBEKISTAN
- -
- 2017
- 30 m²
- APEAS
- HÜKÜMET
- -
- Commitment Energy
- Electrical
Weak Current Systems: Fire alarm system, data-telephone structural cabling system, passive&active network system equipments,building management system cabling and equipment and panelboard connections.
Power systems:LV panelboards,lighting installations, switches&sockets, earthing and all power cabling installations. Project is turn-key and lump sum including all these systems.