HYATT REGENCY HOTEL - TASKENT
    • CONTINENT
    • COUNTRY
    • LOCATION
    • YEAR
    • MAIN AREA
    • CONTRACTOR
    • CLIENT
    • ARCHITECTURE
    • CATEGORY
    • DESCRIPTION
    • ASIA
    • UZBEKISTAN
    • -
    • 2016
    • 55 m²
    • APEAS
    • POYTAHT KURILIS VA HIZMAT VE TREST 12
    • -
    • Commitment Energy
    • Electrical
      Weak Current Systems: Room&Lighting management system, fire alarm system, voice evacuation system, security&card access system,intercom system, central clock system, data-telephone structural cabling system, passive&active network system equipments,building management system cabling and equipment and panelboard connections. Power systems:MV Cubicles, transformers, generators, UPS system, all distribution panelboards,lighting installations, switches&sockets, earthing, busbar system, electrical floor heating and all power cabling installations. Project is turn-key and lump sum including all these systems.